top of page

Cliprail System

Clip Rail Under Floor Heating System

Most commonly found in new builds, this system is easy to install straight on top of an insulated sub-floor prior to a final layer of traditional sand/cement or liquid poured screed.

The system offers fast and flexible installation and is an extremely effective system in a block and beam environment.

Once installed the system is pressure tested, the system must hold pressure for at least 24 hours prior to the final screed being applied.

bottom of page